It takes three men three days to dig a hole. How long does it take one man to dig half a hole?

It takes three men three days to dig a hole. How long does it take one man to dig half a hole?

AIDS happened because a nigger fucked a monkey

4.5
/thread

nope

Wtf is " half a hole " fag

never said how big the holes has to be.

5 seconds

no such thing as half a hole

>/thread his own post
>trick question flew right over his head
congrats, you're both new and retarded.

This

2/9 day

If I told you to dig a hole, then dig a second hole and fill the first one up with the dirt from the second one, how long would it take you to figure it out ?

that wasnt me you dumb cunt

Retard
1'5days. That said without considering break times and stuff. If the three workers make turns to dig the hole amd in a group they work 24h nonstop it doesnt make sense and ur a faggot

who was it then fucktard

how the fuck should i know faggot

who asked you cunt face

1,5

Op....It takes half a day faggots

how long would it take half a man to dig an whole hole?

Half a hole.

which half, top or bottom

1 and a half you turbocharged potato

if it wasn't you, then I wasn't fucking talking to you.

are you stupid is the left half

There is no such thing as half a hole. If you remove a layer of atoms from the top of the dirt you have made a hole 1 atom deep

At least two people are required to operate a shovel.

that's just a depression, not a hole

No it's the right half you stupid dragon dildo fondler

What color is he?

4 and a half

3 men 3 days 1 hole
1 man 9 days 1 hole
1 man 4.5 days .5 hole

3 men need 3 days
so 1 man needs 3 times that long, making it 9 days per hole
half a hole needs half the time, so 4.5 days

he's right you know

how smalls your shovel

>.5 hole
what about -1 hole?

>he's right you know
>implying there's such a thing as "half a hole"
kys thanks

could be half as deep, asshole
i know it's hard for a murricans to think, but please try it.

All I know is three days? They clearly aren't mexicans.

half as deep is a smaller hole..not...
half a hole potato brains

ohh, look at the itg talkin bout murricans. fuck murricans.

9/11 days

Your mom has half a hole. Actually it's a whole hole now lmao

Where does the dirt go? If he puts it to the side then he'll have a little hill.

0.5 hole + 0.5 hill = 0
Could take no time, could take infinity time. The choice is yours

It takes three fags three days to fill OP's hole. How long does it take one fag to fill half a hole?

A hole is a whole hole, no matter how big or how "finished" that hole is.

Using a diamond shovel would be the quickest way to achieve the desired effect. It's because diamond is the hardest metal but they don't make shovels out of it because it's so heavy. 1 gram of diamond is something like 15 grams

Again with the trick questions.

OP is such a massive faggot, you could jump into his hole and not fill it.

I have heard of double vaginal penetration. but triple? Damn!!!

Its half a hole so it goes twice as fast. 1.5 days.

...

define the parameters of the hole.

Its because diamonds are expensive you fuck wit.

None. The hole is already dug.

Op's hole is up for rent

-0 9days idiot.

where's the vagina>?

its dark, soft, and moist

see
and save the condescension for someone dumber than you

itt retards flinging shit at each other

What the fuck is "half a hole"? 50% of the work? 50% of the volume? 50% of the depth? 50% of the time. Half of what unit?

Trolls trolling trolls digging holes

It takes 9 manpower units to dig 1 hole in 72 hours.
72 hours of time elapsed for a hole.
72/9= 8.
So it would take 1 man 8 days to dig the entire hole.
It takes 4 days to dig a hole half that size.

Define half a hole. It's not even linear.

7 holes

This is a retarded query. Is there even any such thing as half a hole? Do you mean a hole half as deep? They wouldn't put out equal work either.....as stupid as your wording is I'm guessing you're looking for 4 and a half days, if they all work the same and the hole is half as deep.

with half a spade ?

>half that size
no one said anything about digging a hole "half that size"

Woops meant 4.5 days. 9 days for entire hole.

No. Quit that, you're doing it wrong. Stop it.

About 5 min because he was smart enough to use a backhoe.

I lol'd

you don't bury the survivors. DUH

It took one day the other 2 were just niggers that just stood around who he had to hire due to affirmative action

/thread

time to pack and leave

I corrected my mistake hereWhat else is wrong? I think other people got it too

...

but some of those might be mexicans smoking instead of digging the hole.
You have to subtract that out from man power units.

I assume half hole means "a hole half the size of the reference hole". Or "halfway done with the intended hole" while only 1 man works on the hole.

Otherwise, trick question

3 men, 3 days = 100%

1 men = 3*3 = 9 days = 100%
50% = 9/2 = 4.5 days

What's wrong is you made it about 47 times more complicated than it had to be and put your malfunctioned mental process on display, that's why that user is kekking. A normal person could just look at it and figure it out pretty much instantly. Manpower units, smh...

Your digging a hole for your self now

Some people got different answers and I figured it would be easier to avoid a mistake if I wrote out hours and men. I messed up still but acknowledged it.

Since it's a shitty thread anyway I'll chip in. What is broken without being touched

A promise

Well here's a tip. 3 is easier to work with than 72. Keep it simple.

If you didnt post it why the hell are you responding to user? You know how i know your a newfag.....

Smart arse cunt, bang on, shake your dick in celebration

Half a shovel

A niggers self worth

Assuming it's linear, one man can dig a third of a hole in 3 days, so 1/9th of a hole in 1 day. It would take 4 and a half days for one man to dig one half of a hole.

What if the man only has half a dick?

ITT: everyone falling for the 4.5 days trick

I thought we came to the conclusion you can't dig half a hole.

My Sanity
With this thread

Fancy a bum ?

He looks like you and digs into half a hole

this ones prolapsed anus

If it takes half of my dick to dig half a hole in half a day; how long would it take my whole dick to dig a hole in your whole whore ass?

I wanted to use larger units because somebody else got 1.5 days and I think I know how.
They were probably thinking "3 men dig 1 hole in 3 days. 1 man does 1/3 of the work (per day). If he does 1/3 of the work, he should get done in 3 days. (Error here). Half of 3 days is 1.5 days".

Having the number "3" occurring twice in the conversationally written problem (3 men, 3 days) makes it easier to make a mistake.
Yes I still made a mistake but my comment box was not right next to the OP post and I didn't write it all at once without pausing to read some other comments in the mean time. I mixed up two digits and then realized after.

Lets see... (2x^3)^3(3x^4)= nigger. Yes it takes nigger

Checked

>It takes 9 manpower units to dig 1 hole in 72 hours.